"We hired Aharon from MNBE Construction & Development to build our ADU in Bellevue, and the entire experience was amazing. Aharon handled absolutely everything for us from the very beginning until completion."
ADU & DADU Builder for Seattle & the Eastside
MNBE designs, permits, and builds detached ADUs, attached ADUs, basement ADUs, and backyard cottages across Seattle, Bellevue, Kirkland, Redmond, and the Eastside, one team, one fixed price contract. King, Snohomish & Pierce County.
What We Build
Every ADU type Washington allows, built for your lot.
We are an ADU and DADU builder serving Seattle and the Eastside, from Bellevue and Kirkland to Redmond, Sammamish, and Mercer Island. We check what your lot can support, then design it, take it through the permit and build it with our own crew, from the first sketch to the final inspection, so you deal with one builder the whole way.
An accessory dwelling unit can take four forms: a detached ADU (DADU), a freestanding backyard cottage set apart from your house; an attached ADU (AADU) joined to your home; a basement ADU conversion created from your lower level; or a garage conversion that reuses a structure you already have. Washington's HB 1337 requires cities to allow at least two ADUs on most lots, Seattle and the Eastside cities now allow two, there is no owner occupancy requirement, and Seattle requires no off street parking for an ADU. We design, permit, and build all four, and after a free site visit we will tell you which one fits your lot and your goals.
ADUs and DADUs we have built, and the ones going up now.
Four are finished and two are under construction. Each project page walks through the build stage by stage, with photos from the job site, and you can watch the builds.
What a build looks like in practice: on our two-story DADU in Kirkland, the tree protection fencing went up before any digging, and the footings and foundation walls went in as one pour. Photos of the work and the city's inspection record are on the Kirkland DADU project page.

Magnolia DADU, Seattle
Completed 2026. A 460 sq ft detached ADU on a tight Magnolia lot, with a standing seam metal roof, a glass garage door, a full kitchen and a spa shower. See the project

White Center ADU
Completed 2026. 500 sq ft with two bedrooms, a full kitchen and 1.5 baths, built from a bare lot. See the project

Redmond DADU
Completed 2026. A 100 year old structure taken down to the studs and rebuilt as a code compliant detached ADU: 1,000 sq ft with two bedrooms. See the project

Bellevue attached ADU
Completed 2024. 700 sq ft with one bedroom, attached to the house by one shared wall, with its own entry, a full kitchen and a full bath. See the project

Kirkland DADU
Under construction. Two stories and 1,100 sq ft, with two bedrooms and two bathrooms. See the build

Seattle studio DADU
Under construction. A 400 sq ft studio home above a 400 sq ft garage, on an alley lot. See the build
Timeline & Warranty
How long an ADU takes, and the warranty it comes with.
From first call to certificate of occupancy, most ADU and DADU projects take eight to fourteen months. Construction is the short part: about three to four months once the permit is issued. The order of the work, stage by stage, is in How long does it take to build an ADU?
Every ADU and DADU is handed over with a written warranty in the contract: 10 years on the structure, 2 years on mechanical, electrical and plumbing, and 1 year on workmanship.
What sets the price of an ADU
Priced to your lot.
Every ADU is priced to your specific lot, never a generic per square foot number. Slope and soils, utility connections, access, and finish level move the total far more than floor area does, so we walk your property first. After a free site visit you get a written fixed price that covers design, permits, and construction, and the number we sign is the number we build to. See the eight things that set the cost of an ADU.
Every MNBE ADU includes
- Architectural drawings and design
- Structural engineering
- Permits, plan check corrections, and inspections
- Full construction by MNBE, founder supervised
- One fixed price contract, founder supervised

How It Works
From first site visit to keys, one team.
No handoffs. Here is exactly how your ADU goes from idea to a finished, rentable space.
Free site visit
We walk your lot, confirm what your zoning and critical areas allow, and talk through your goals.
Design & feasibility
Architectural drawings, structural engineering, and a written bid, so you know the number before permits.
Permits
We prepare and submit to your city, answer every plan check correction ourselves, and schedule the inspections.
Build
One licensed crew, founder supervised, from foundation to finishes, on the fixed price we signed.
Keys
Final inspection, certificate of occupancy, and a finished ADU ready to live in or rent.
Where We Build
Where we build ADUs and DADUs.
Seattle, the Eastside and the cities north and south of them. Each city sets its own size, height and parking numbers. Compare them side by side in our ADU rules by city, or pick your city.
- ADU builder in Seattle Seattle ADU rules
- ADU builder in Bellevue Bellevue ADU rules
- ADU builder in Kirkland Kirkland ADU rules
- ADU builder in Redmond Redmond ADU rules
- ADU builder in Shoreline Shoreline ADU rules
- ADU builder in Edmonds Edmonds ADU rules
- ADU builder in Bothell Bothell ADU rules
- ADU builder in Lynnwood Lynnwood ADU rules
- ADU builder in Sammamish Sammamish ADU rules
- ADU builder in Mercer Island Mercer Island ADU rules
- ADU builder in Medina Medina ADU rules
- ADU builder in Kenmore Kenmore ADU rules
- ADU builder in Renton Renton ADU rules
- ADU builder in Tukwila Tukwila ADU rules
- ADU builder in Woodinville Woodinville ADU rules
- ADU builder in Everett Everett ADU rules
In Seattle we also build in Magnolia and Queen Anne. Our ADU rules by city guide also covers unincorporated King County, Sumner and Lake Tapps.
Reviews
What homeowners say about building with MNBE.
From our Google reviews. See all our reviews on Google
"We recently completed a DADU construction project in Seattle with MNBE Construction and Development LLC, and we couldn't be happier with the results. … The workmanship was excellent, communication was clear, and the entire process was handled professionally from start to finish."
The ADU questions homeowners ask before they hire.
Real answers from a real builder. Call us if yours isn't here. We answer the phone Sunday through Friday.
Two, on most residential lots in the cities where we build: attached, detached or one of each. Washington's HB 1337 requires cities to allow at least two. Size, height and parking differ by city, and lots with critical areas can allow fewer. See what your city allows. We confirm exactly what your specific lot supports during the free site visit. More in How many ADUs can I build on my lot?
An ADU (accessory dwelling unit) is any independent living unit on your lot, with its own kitchen, bath, and entrance. A DADU is the detached version, a freestanding building that Seattle also calls a backyard cottage, while an attached ADU shares a wall or sits above the garage. Many owners choose a detached DADU for privacy and rental value. More in DADU vs attached ADU: which fits your lot?
It depends on your lot, and that is the honest answer. Slope and soils, utility connections, access, and finish level move the cost far more than floor area does, so we do not quote a generic per square foot number. After a free site visit you get a written fixed price that covers design, permits, and construction, and the number we sign is the number we build to.
Most ADU and DADU projects take eight to fourteen months from first call to certificate of occupancy, and construction is about three to four months of that, once the permit is issued. A pre-approved DADU plan can shorten the permit step, and the order of the work, stage by stage, is in How long does it take to build an ADU?
No. None of the cities in our ADU rules guide requires the owner to live on the property, so you can rent the main house, the ADU, or both. Rules for short-term rentals differ by city. We deliver a permitted, code compliant unit that is ready to lease once it passes final inspection. More in Do you have to live on the property?
More answers are on our FAQ page.
View all FAQsTell us about your ADU project.
We'll get back to you within one business day with a clear next step.
Contact information
Thank you for considering MNBE for your ADU or DADU project. We respond within one business day, Sunday through Friday.
