"We hired MNBE Construction & Development for a full renovation of our 100+ year old home, and the results exceeded expectations. They handled full structural upgrades, … brand new insulation, … a luxury bathroom, a high-end kitchen, … a new roof, and mini-split AC units."
Detached ADU (DADU) builder for Seattle & the Eastside.
MNBE designs, permits, and builds detached ADUs end to end across Seattle, Bellevue, Kirkland, Redmond, Mercer Island, Sammamish, and the Eastside, one team, one fixed price contract. King, Snohomish & Pierce County.
What A DADU Is
A detached, fully independent second home on your lot.
A DADU is a Detached Accessory Dwelling Unit: a small, fully independent home built on the same lot as your primary residence, with its own front door, its own kitchen, and its own bathroom. No shared walls, no shared roof, a separate structure designed to function as a real second home. We are a detached ADU builder serving Seattle and the Eastside, from Magnolia and Green Lake to Bellevue, Kirkland, Redmond, Mercer Island, and Sammamish, and we handle the entire process from the first sketch to final inspection.
ADU is the umbrella category that also includes the attached ADU (AADU) and the basement ADU. The DADU is the freestanding one, and it is the version homeowners ask us for first. Privacy and rental value are the reason. Washington's HB 1337 requires cities to allow at least two ADUs on most lots, with no owner occupancy requirement, and Seattle requires no off street parking for an ADU. In Seattle most homeowners call it a backyard cottage: see our Seattle backyard cottages. Start with the ADU and DADU overview, and after a free site visit we tell you in writing whether a DADU is buildable on your lot.
Our detached builds: the Magnolia DADU in Seattle, completed in 2026, and the Redmond DADU, a 100 year old structure rebuilt to the studs and completed in January 2026. Two more are under construction now: the two-story, 1,100 sq ft Kirkland DADU, and a 400 sq ft studio DADU above a garage on a Seattle alley lot. See what we build in each place on our Magnolia, Redmond and Kirkland ADU and DADU builder pages.
Seattle DADU Rules · 2026
The numbers behind a detached unit.
Washington's HB 1337 reshaped what you can build detached on a Seattle lot. These are Seattle's numbers. Building in Seattle? See our ADU and DADU builder page for Seattle, or the rules in your city.
What sets the price of a DADU
Priced to your lot.
We do not publish a per square foot number because the average never matches your lot. Six factors move a DADU bid the most: lot access, whether a concrete truck can reach the site or we have to pump; soils and foundation, since a flat well drained lot takes a slab while a steep Magnolia or Mercer Island slope may need stem walls or piers; utility distance from your existing services; finish level, from a durable mid tier rental to a premium family unit; design complexity, where a pre-approved Seattle plan keeps design simpler and a custom layout adds engineering; and critical area review on slopes, wetland buffers, or tree retention. After a free site visit you get a written fixed price that breaks out every line item, and the number we sign is the number we build to. The eight things that set the cost of any ADU are in What drives the cost of an ADU.
Every MNBE DADU includes
- Free site visit before any design contract
- Architectural drawings, including pre-approved DADU sets where they fit
- Permits, plan check corrections, and inspections
- Full construction by MNBE, founder supervised
- One fixed price contract with a 10 year structural warranty


How It Works
From feasibility to keys, one team.
No handoffs. Here is exactly how your DADU goes from a buildable lot to a finished, rentable detached home.
Free site visit
We walk your lot, run the zoning code, check critical areas, and confirm HB 1337 in writing before any design contract.
Fixed price contract
A written bid with every line item visible: permits, design, foundation, framing, mechanicals, finishes, and warranty.
Permits
We prepare and submit to your city, use pre-approved DADU sets where they fit, and answer every correction ourselves.
Build
One licensed crew, founder supervised, from foundation to finishes, with weekly homeowner updates.
Keys & warranty
Final inspection, certificate of occupancy, and a finished DADU handed over with a written warranty: 10 years on the structure, 2 years on mechanical, electrical and plumbing, and 1 year on workmanship.
Reviews
What homeowners say about building with MNBE.
From our Google reviews. See all our reviews on Google
"We recently completed a DADU construction project in Seattle with MNBE Construction and Development LLC, and we couldn't be happier with the results. … The workmanship was excellent, communication was clear, and the entire process was handled professionally from start to finish."
DADU questions homeowners ask before they hire.
Practical answers from a builder who designs, permits and builds detached ADUs. Call us if yours isn't here. We answer the phone Sunday through Friday.
A DADU is a Detached Accessory Dwelling Unit, a fully separate small home on the same lot as the primary residence. ADU is the umbrella term covering attached units (AADUs), basement conversions, and junior interior conversions; the DADU is the freestanding version. Many Seattle and Eastside owners choose it for privacy, rental value, and clean separation. Side by side: DADU vs attached ADU.
On almost every single family lot, yes. Seattle allows two ADUs on most residential lots, and HB 1337 (2023) made at least two ADUs the rule in cities across the state's urban growth areas. A detached unit is one valid option. The usual limits are lot coverage, critical areas, and large trees that leave no room for a detached unit. We confirm yours with a free site visit.
Seattle allows a DADU up to 1,000 sq ft of gross floor area, or 1,200 sq ft with three or more bedrooms, and as tall as the house limit: 32 feet in Neighborhood Residential zones, plus pitched-roof allowances, so two-story DADUs are allowed. Bellevue and Kirkland allow up to 1,200 sq ft per ADU, and Redmond and Mercer Island up to 1,000 sq ft.
Construction takes about three to four months once the permit is issued, and most projects take eight to fourteen months in all, from first call to certificate of occupancy. Seattle's pre-approved DADU plans can shorten the plan review step, and the order of the work, stage by stage, is in How long does it take to build an ADU?
Cost varies lot to lot, so we don't publish a per square foot number that wouldn't apply to your project. The biggest budget drivers are lot access, soil and foundation conditions, utility distance, finish level, and design complexity. After a free site visit we deliver a written fixed price contract covering design, permits, and construction, line by line.
The number depends on the approved plans and the work involved. Our Kirkland DADU project page shows the city's dated inspection record alongside construction photographs.
More answers are on our FAQ page.
View all FAQsTell us about your DADU project.
We'll get back to you within one business day with a clear next step.
Contact information
Thank you for considering MNBE for your detached ADU project. We respond within one business day, Sunday through Friday.
