"We hired Aharon from MNBE Construction & Development to build our ADU in Bellevue, and the entire experience was amazing. Aharon handled absolutely everything for us from the very beginning until completion."
DADU vs attached ADU: which fits your lot?
A DADU is its own building in the yard. An attached ADU shares a wall with your house. The lot and your city's rules decide which one fits. Answered by MNBE founder Aharon Ben Elisha. City rules checked November 26, 2026.
The Short Answer
A DADU for privacy. An attached ADU for a tight lot.
A DADU is a detached accessory dwelling unit: a small, fully independent home in its own building on your lot, with no shared walls and no shared roof. An attached ADU, or AADU, is a self contained second home that shares at least one wall with your house.
Both have their own front door, their own kitchen and their own bathroom. Both count toward the two ADUs per lot that Washington's HB 1337 requires cities in urban growth areas to allow, and both can be rented separately. What differs is where the unit sits, what it shares with the house, and which lots it fits. Two more names you will hear: a backyard cottage is what Seattle homeowners call a DADU, and a basement ADU is a unit made from the lower level of the house.
When a DADU fits
A detached ADU is a separate structure, so the two homes stay apart. It is the version homeowners ask us for first, and privacy is the reason. It needs room in the yard. The usual limits are lot coverage, critical areas, and large trees that leave no room for a detached unit.
When an attached ADU fits
An attached ADU works on tight infill lots where a freestanding building will not fit. A tight lot with critical areas, tree canopy or restrictive setbacks may not fit a DADU but can support an attached unit. An attached ADU can use existing space or extend the house. Sharing a wall and nearby utility connections can reduce the work, but the structural design determines whether new footings or foundations are needed. The tradeoff is privacy across the shared wall.
Your city decides too
Each city wrote its own ADU code. Bellevue is the clearest example. When we designed our attached ADU in Bellevue, the city's code allowed only attached ADUs, so an attached unit was the answer from the start. Bellevue has allowed detached ADUs since July 2025. See what four cities allow today in the city table further down.
Side by Side
DADU and attached ADU, side by side.
The same kind of home, placed two ways on the lot.
| What differs | DADU (detached) | Attached ADU (AADU) |
|---|---|---|
| The building | A separate structure. No shared walls, no shared roof. | Shares at least one wall with the existing house. |
| Front door, kitchen, bathroom | Its own. | Its own. |
| Foundation | A new foundation of its own. | Uses existing or new foundations, depending on the design. |
| Utilities | On our Kirkland DADU: new sewer and water connections to the street. | Connections depend on the existing systems and the approved design. |
| Privacy | Clean separation from the main house. | One shared wall, built as a one hour fire rated wall with sound attenuation. |
| The lot | Needs room in the yard. | Fits a tight infill lot. |
| Size in Seattle | Up to 1,000 sq ft, or 1,200 sq ft with three or more bedrooms. | The same as a DADU. |
| Counts toward the two ADUs per lot | Yes. | Yes. |
From our detached ADU, attached ADU and Kirkland DADU pages. We confirm exactly what your specific lot supports during the free site visit.
City by City
What four cities allow.
Four rows from our ADU rules by city table. Open a city's guide for the full rules and sources.
| City | Headline rules | Full guide |
|---|---|---|
| Seattle | Two ADUs in any mix. 1,000 sq ft, or 1,200 with three or more bedrooms. DADU height follows the house, 32 feet in Neighborhood Residential zones. No parking. | Seattle guide → |
| Bellevue | Two ADUs; detached allowed since July 2025. 1,200 sq ft. DADUs 24 feet. No ADU parking is required for an ADU of 1,000 sq ft or less, excluding garage area; for residential development wholly or partly in a Station Area; or for an ADU wholly or partly within half a mile walking distance of a major transit stop. Otherwise, one space per ADU is required unless another exemption applies. | Bellevue guide → |
| Kirkland | Two ADUs of either type. 1,200 sq ft. Height follows the house, 25 to 30 feet. No ADU parking since September 2026. | Kirkland guide → |
| Redmond | Two ADUs. 1,000 sq ft. Up to 38 feet in NR. Backyard buildings capped at 60% of the house's ground floor. No parking. | Redmond guide → |
Checked November 26, 2026 against each city's code; the sources are listed in each guide. A plain-English summary, not legal advice. Your city is not here? See all 18 guides in ADU rules by city.
Both types, on real lots.
A finished DADU, a DADU going up now, and a finished attached ADU. Each project page walks through the build stage by stage.
Reviews
What Seattle homeowners say about building with MNBE.
From our Google reviews.
"We hired MNBE Construction & Development for a full renovation of our 100+ year old home, and the results exceeded expectations. They handled full structural upgrades, … brand new insulation, … a luxury bathroom, a high-end kitchen, … a new roof, and mini-split AC units."
"My mom hired MNBE Construction for her two-bedroom DADU in Seattle, and watching the process up close was impressive. They did it all: design, architectural plans, the building permit, and the full construction. … The communication was excellent and there were never any surprises."
"We recently completed a DADU construction project in Seattle with MNBE Construction and Development LLC, and we couldn't be happier with the results. … The workmanship was excellent, communication was clear, and the entire process was handled professionally from start to finish."
DADU and attached ADU questions.
More answers: How many ADUs can I build on my lot? · Can an ADU be two stories? · How long does it take to build an ADU? · Can an ADU have its own address? City rules: Seattle, Bellevue, Kirkland and Redmond. All cities: ADU rules by city.
It is the same kind of unit under a different name. Seattle's zoning code calls it an AADU. The wider real estate world often says attached ADU or in-law suite.
On most residential lots in the cities where we build, yes. Washington's HB 1337 requires cities to allow at least two ADUs: attached, detached or one of each. Size, height and parking differ by city, and lots with critical areas can allow fewer.
In Seattle it is the same: up to 1,000 sq ft of gross floor area, or 1,200 sq ft with three or more bedrooms. Bellevue and Kirkland allow up to 1,200 sq ft per ADU, and Redmond and Mercer Island up to 1,000 sq ft.
Usually not. Most jurisdictions allow shared utilities when the connection is engineered for the combined load: a dedicated subpanel fed from the main panel, a shared sewer lateral with separate cleanouts, and shared water service. If the existing panel can't carry the second unit, a panel upgrade or separate service is required.
We check it on your lot. After a free site visit we tell you in writing whether a DADU is buildable on your lot, and whether an attached unit is the better fit.
Tell us about your project.
We'll check your address against your city's ADU code and get back to you within one business day with a clear next step.
Contact information
Thank you for considering MNBE. Tell us your address and we will tell you, in writing, what your city's code allows on your lot. We respond within one business day, Sunday through Friday.



