Woodinville ADU & DADU rules, in plain English
What Woodinville's code allows for attached and detached ADUs today, rule by rule, with the code section or city page behind each one.
Written by MNBE founder Aharon Ben Elisha. Rules checked .
The Update
What changed in Woodinville.
Woodinville readopted its ADU section in Ordinance 792, passed August 5, 2025 and effective August 13, 2025. The ordinance says it brings the city "into compliance with HB 1110 and HB 1337". The rules sit in WMC 21.41.020.
The city does not run water and sewer. Woodinville Water District issues the water and sewer availability certificates needed before applying (city Water & Sewer Permits page).
Planning to build? See our Woodinville ADU and DADU builder page and how we build detached ADUs (DADUs). Rules for other cities are in our ADU rules by city guide. Nearby: Bothell ADU rules, Kirkland ADU rules and Redmond ADU rules.
Woodinville · Woodinville Municipal Code
Woodinville's ADU rules, by the numbers.
The four numbers homeowners ask about first. Check them against your lot with a feasibility study →
The Code
Woodinville ADU rules, line by line.
The residential zones where an ADU is allowed, R-1 to R-18. Zone-specific numbers vary, so we confirm them for each lot.
| Rule | What Woodinville allows | Source |
|---|---|---|
| ADUs per lot | Two per parent lot. They may be inside the house, attached, stacked or stand-alone, in any mix. The first ADU counts toward the zone's maximum dwelling units per lot: 2 units in R-1 and R-4, 3 units in R-6 to R-48. The second ADU is excluded from that count. | WMC 21.41.020, WMC 21.31.030 |
| Size | From 300 sq ft to 1,500 sq ft of habitable floor area, for attached and detached alike. There is no percent-of-house limit. Habitable floor area leaves out vehicle parking, outdoor open-air floors and areas with ceilings less than five feet high. | WMC 21.41.020 |
| Height | No ADU-specific height. The zone height applies: 35 feet in R-1, R-4, R-6, R-8 and R-12, and 45 feet in R-18. A pitched roof may rise up to 10 feet above the limit under the conditions in WMC 21.32.040(6)(h). | WMC 21.32.040 |
| Setbacks | Zone setbacks apply. Street property lines: 10 feet. Interior property lines, side and rear: 5 feet in R-4 to R-18, and 10 feet in R-1 (5 feet on R-1 lots under 15,000 sq ft). A detached ADU may have the setback reduced to zero from any property line abutting a dedicated public alley. The code has no separate rear setback. | WMC 21.32.030, WMC 21.41.020 |
| Coverage | Building coverage limits apply to the whole lot. They change with the zone and the lot size. | WMC 21.32.050 |
| Minimum lot size | The ADU section sets no minimum lot size for an ADU. Zone minimum lot areas apply to the lot itself: 35,000 sq ft in R-1, 9,000 in R-4, 6,000 in R-6, 5,000 in R-8, 3,600 in R-12 and 2,400 in R-18. | WMC 21.41.020, WMC 21.31.030 |
| Parking | One stall per ADU, unless a parking exemption applies. Woodinville’s published code does not list a transit exemption; state law generally prohibits requiring ADU parking within half a mile walking distance of a major transit stop. Tandem stalls are allowed when assigned to individual dwelling units. A driveway in a setback may be used for parking but is not counted. | WMC 21.37.060 and 21.37.070 |
| Owner occupancy | Not required. WMC 21.41.020, as readopted in 2025, contains no owner-occupancy rule. | WMC 21.41.020 |
| Existing structures | An ADU may be converted from an existing enclosed structure, even one not complying with building coverage or setback standards, if the structure was legally established. | WMC 21.41.020 |
| Design | ADUs should have, but are not required to have, an outside appearance similar to the primary dwelling. No entrance-location rule appears in the ADU section. Prefabricated units placed on a permanent foundation are allowed. | WMC 21.41.020 |
| Rentals | ADUs are prohibited from being rented for periods of fewer than 30 consecutive nights. | WMC 21.41.020 |
| Zones | ADUs are a permitted use in R-1, R-4, R-6, R-8, R-12 and R-18. They are not allowed in R-24, R-48 or the commercial, industrial and other zones. | WMC 21.21.050 |
| Impact fees | ADUs pay only 50 percent of the park impact fee calculated for the largest primary dwelling unit. ADUs approved under WMC 21.41.020 are exempt from school impact fees. | WMC 3.36.080, WMC 3.38.040 |
| Street improvements | Street frontage improvements are not required for new attached or detached ADUs. | WMC 21.63.020 |
| Water and sewer | The city does not run water and sewer. Woodinville Water District issues the water and sewer availability certificates needed before applying. | City Water & Sewer Permits page |
Checked . Sources: WMC 21.41.020, WMC 21.21.050, WMC 21.31.030, WMC 21.32.030, WMC 21.32.040, WMC 21.32.050, WMC 21.37.060 and 21.37.070, WMC 21.63.020, WMC 3.36.080, WMC 3.38.040, Ordinance 792 and City Water & Sewer Permits page. The city's code has moved to eCode360. The copy linked here is current through Ordinance 811, passed August 4, 2026, and we confirm later ordinances for each lot. A plain-English summary, not legal advice. The code governs, and we confirm it for your lot.
Free Estimate
Check these rules against your Woodinville lot.
Tell us what you are planning. We reply within one business day, Sunday through Friday.
Your Lot
How we check a Woodinville lot for an ADU.
The code sets the outer limits. Your lot sets the real ones. This is the order we work in during the free site visit and feasibility.
Zone and overlays
We confirm your zone and check the lot for critical areas and shoreline rules, which can limit a lot.
Trees
Tree rules can limit a lot. We locate the trees on your lot before we place the ADU.
Fit the footprint
We test size, height, setbacks and building coverage against your lot and its zone, and whether an existing building can be converted.
Utilities
We check whether water, sewer and power can come from the house or need their own connections.
Design and permit
We draw the plans in house, submit to Woodinville, answer corrections and carry the project through inspections.
Reviews
What homeowners say about building with MNBE.
From our Google reviews.
"We hired MNBE Construction & Development for a full renovation of our 100+ year old home, and the results exceeded expectations. They handled full structural upgrades, … brand new insulation, … a luxury bathroom, a high-end kitchen, … a new roof, and mini-split AC units."
"My mom hired MNBE Construction for her two-bedroom DADU in Seattle, and watching the process up close was impressive. They did it all: design, architectural plans, the building permit, and the full construction. … The communication was excellent and there were never any surprises."
"We recently completed a DADU construction project in Seattle with MNBE Construction and Development LLC, and we couldn't be happier with the results. … The workmanship was excellent, communication was clear, and the entire process was handled professionally from start to finish."
Common questions about Woodinville's ADU rules.
Short answers from the code. For your exact lot, call us or book the free site visit.
Two per parent lot: inside the house, attached, stacked or stand-alone, in any mix (WMC 21.41.020).
From 300 to 1,500 square feet of habitable floor area, for attached and detached ADUs alike. There is no percent-of-house limit (WMC 21.41.020).
There is no ADU-specific height limit. The zone limit applies: 35 feet in R-1, R-4, R-6, R-8 and R-12, and 45 feet in R-18 (WMC 21.32.040).
One stall per ADU, unless a parking exemption applies. Woodinville’s published code does not list a transit exemption (WMC 21.37.060); state law generally prohibits requiring ADU parking within half a mile walking distance of a major transit stop.
No. Woodinville prohibits renting an ADU for periods of fewer than 30 consecutive nights (WMC 21.41.020).
Tell us about your lot. We check it against Woodinville's ADU rules.
Add the property address to your message. We'll check it against Woodinville's ADU code and get back to you within one business day with a clear next step.
Contact information