ADU & DADU Builder in Woodinville, WA
MNBE designs, permits and builds ADUs, DADUs and custom homes for Woodinville homeowners, with one licensed team from the first site visit to the final inspection.
MNBE designs, permits and builds ADUs, DADUs and custom homes for Woodinville homeowners, with one licensed team from the first site visit to the final inspection.
One licensed, bonded team for the whole job, from design and City of Woodinville permitting to fixed price construction.

Detached ADUs, attached ADUs and ADUs inside the house: two per parent lot, from 300 to 1,500 sq ft of habitable floor area each, under Woodinville's 2025 ADU code (WMC 21.41.020).
Explore Service
Drawings prepared for City of Woodinville review, checked against the zone's setbacks, height and building coverage before we file.
Explore Service
Where the lot supports it, we replace an aging Woodinville home with a new one, after we check the lot.
Explore ServiceWhy MNBE in Woodinville
Woodinville readopted its ADU section in Ordinance 792, in force since August 13, 2025. We check your lot against WMC 21.41.020 before design: zone, setbacks, building coverage and the parking stall each ADU needs. Every submittal and every response to the city is handled by us, never a third party expediter.
The city does not run water and sewer. Woodinville Water District issues the water and sewer availability certificates that are needed before applying for the permit. We request them at the start, so they don't hold up the submittal later.
We have finished detached ADUs in Seattle and on the Eastside, like our Redmond build, a century-old structure rebuilt from November 2025 to January 2026 as a modern DADU with a new roof, siding, kitchen and heat pump. The full project is on the project page.


What We Build
A freestanding backyard home with its own entrance. Woodinville allows an ADU from 300 to 1,500 sq ft of habitable floor area. There is no ADU-specific height limit: the zone limit applies, 35 feet in R-1 to R-12 and 45 feet in R-18.
Connected to the main house by a shared wall or addition. Woodinville allows two ADUs per parent lot, attached, detached or one of each, with no owner occupancy requirement. Each ADU needs one parking stall.
An ADU may sit fully inside the primary house. An ADU may also be converted from an existing enclosed structure, even one that does not comply with building coverage or setback standards, if the structure was legally established.
On some Woodinville lots a new home is the better answer. We check that first, and build it under the same license and a fixed price contract.
Woodinville ADU Rules
Woodinville allows two ADUs per parent lot: attached, detached or one of each. Each can have 300 to 1,500 sq ft of habitable floor area, and the zone's height limit applies.
Checked November 10, 2026. Every rule, with its code section and its exceptions, is in our Woodinville ADU rules guide.
FAQ
Answers to common questions about building an ADU in Woodinville.
Yes. Woodinville allows a maximum of two ADUs per parent lot: inside the house, attached, stacked or stand-alone, in any mix (WMC 21.41.020). The first ADU counts toward the zone's maximum dwelling units per lot, and the second is excluded from that count.
From 300 sq ft to 1,500 sq ft of habitable floor area, the same for attached and detached. There is no percent-of-house limit (WMC 21.41.020).
There is no ADU-specific height limit. The zone limit applies: 35 feet in R-1, R-4, R-6, R-8 and R-12, and 45 feet in R-18 (WMC 21.32.040).
One stall per ADU, unless a parking exemption applies. Woodinville’s published code does not list a transit exemption (WMC 21.37.060); state law generally prohibits requiring ADU parking within half a mile walking distance of a major transit stop. We check the parking for your address during the free site visit.
No. WMC 21.41.020, as readopted in 2025, contains no owner-occupancy rule. ADUs cannot be rented for fewer than 30 consecutive nights.
Every Woodinville rule, with its code section, is in our Woodinville ADU rules guide.
View all FAQsThank you for considering MNBE for your Woodinville ADU or custom home. We respond within one business day, Sunday through Friday.
We design and build ADUs and DADUs for Woodinville lots in the R-1, R-4, R-6, R-8, R-12 and R-18 zones, where the city code allows an ADU, and custom homes where the lot supports one. Each lot is checked against the city code, its zone setbacks and its water and sewer availability before we draw anything.
MNBE also serves Seattle, Magnolia, Queen Anne, Bellevue, Kirkland, Redmond, Sammamish, Mercer Island, Medina, Kenmore, Bothell, Shoreline, Lynnwood, Edmonds, Renton, Tukwila, Everett.