White Center ADU: From Bare Lot to Finished Home
A 500 sq ft, two-bedroom ADU with a full kitchen and bath, built by MNBE and completed in 2026.
A 500 sq ft, two-bedroom ADU with a full kitchen and bath, built by MNBE and completed in 2026.
The film starts on the bare lot: excavation, a laser level setting the grades, footing forms and rebar in the trench, and the foundation pumped into the forms.
Under the slab go the plumbing lines in the gravel base and rigid foam insulation. Then the walls are framed on the slab and raised, the windows arrive, the roof and sheathing close the shell, and the electrical and plumbing rough-in is ready for inspection.
Fiber cement panels with black trim finish the outside. Inside: a full kitchen and a walk-in shower. The home was completed in 2026.
This 56-second film combines MNBE construction footage and project photographs with instrumental music and no spoken narration. The opening presents the White Center ADU from bare lot to finished home. Excavation and laser layout are followed by footing forms, rebar and concrete placement. Plumbing and rigid foam insulation are shown beneath the slab. The walls are framed and raised, followed by windows, roof sheathing, utility rough-in and fiber cement siding. The final scenes show the completed kitchen, walk-in shower and the front of the two-bedroom ADU. Each stage is labeled on screen with its name and a short caption, and the film ends on the MNBE card: Design, Permits, Construction, mnbe-wa.com, (206) 637-0044.
What the homeowner says
My mom hired MNBE Construction for her two-bedroom DADU in Seattle, and watching the process up close was impressive. They did it all: design, architectural plans, the building permit, and the full construction. Aharon kept the project on a clear timeline and met every milestone. The communication was excellent and there were never any surprises. The finished backyard cottage is beautiful and built to a very high standard.
Explore MNBE's completed construction work, or tell us about the ADU, addition or new home you are planning in the Seattle area.
Length 1:31Seattle & the Eastside · All stages
Length 0:56Seattle (Magnolia) · DADU
Length 0:53Bellevue, WA · Attached ADU
Length 0:48Redmond, WA · DADUTell us about your lot. We'll walk it, confirm what's buildable, and come back with a written, fixed price bid.
Thank you for considering MNBE for your project. We respond within one business day, Monday through Saturday.