Kenmore Home Addition: From the Foundation to Today
A two-story addition to a family home in Kenmore, WA, under construction in 2026.
A two-story addition to a family home in Kenmore, WA, under construction in 2026.
The film follows the addition in order, with real job-site photos and video: the footing forms against the existing house, the insulated slab, the new walls and their plywood sheathing, and the second story over the garage.
Then truss day, filmed from our photographer's drone: the trusses arrive on the truck, and a crane sets them on the new second story one at a time. The roof sheathing and the shingles follow.
It ends with our photographer's drone over the new roof and a look inside the new rooms. Everything in the film is real footage from the site, narrated with subtitles. The home is still under construction as of November 2026.
This 2-minute 32-second film is narrated, with subtitles burned into the picture, over an original upbeat music track. The narration: “We're in Kenmore, Washington, building a two-story addition onto a home the family lives in, permitted and inspected by the City of Kenmore. The addition brings a new primary suite, a new bathroom and a laundry room, and it enlarges the existing bedrooms on both floors. It starts right against the house. The footing forms run along the existing wall. Half-inch rebar runs through the footing and the stem wall, and steel dowels tie the new concrete into the existing foundation. Under the new slab: rigid foam insulation, a vapor barrier, and a grid of rebar. Then the slab is poured and finished. The new walls are framed on the slab, two-by-six on the outside, then sheathed in half-inch plywood, nailed every six inches at the edges, so the new wing can resist wind and earthquakes. Then the second story goes up over the garage. The new floor is three-quarter-inch tongue-and-groove plywood, on two-by-ten joists sixteen inches apart. The framing crew measures, cuts and nails every wall on site. Aharon, the owner of MNBE, is on site with the crew, going over the plans. With the second-story walls up and braced, the addition is ready for the roof trusses. Then comes truss day. Twenty-six roof trusses arrive already built, engineered in a truss plant, and the design for every truss carries a licensed engineer's stamp. A crane lifts them off the truck one at a time, and swings each truss over the house to the new second story. The crew sets them twenty-four inches apart, then fastens and braces each one. Every truss is engineered for a six-in-twelve pitch, and for a design wind speed of a hundred and ten miles per hour. By the next morning, every truss is in place, and the new roofline is there. Next, half-inch plywood sheathing goes on over the trusses, row by row. Then the roof is shingled: Class A asphalt shingles over roofing paper, as the plans call for, with metal flashing in the valleys. Here it is from above: the new second story over the garage, under the new roof. From the street, the new second story rises over the garage, sheathed in plywood, with the window openings framed. Inside, the new rooms are framed under the engineered roof trusses. That's where the addition stands today. Windows, siding, systems and finishes are still to come, and we'll keep showing it. We're MNBE Construction and Development. We build home additions and ADUs across Seattle and the Eastside.”