Bellevue Attached ADU: From Excavation to Finished ADU
An attached ADU with a dual entry, a full kitchen and a full bath, built onto the main house.
An attached ADU with a dual entry, a full kitchen and a full bath, built onto the main house.
Right beside the main house: excavation and forms, footings and rebar, foundation walls, a gravel base with the plumbing stubbed through, rigid foam and the slab pour.
The walls are framed on the slab and raised against the house, the roof and sheathing close the shell, house wrap goes on, then lap siding to match the main house and new windows. Rough-in and drywall follow.
It ends with the finished kitchen, living room and bath, and the front with its dual entry.
This 53-second film combines MNBE construction footage and project photographs with instrumental music and no spoken narration. The opening sets the excavation beside the finished attached ADU. Forms and footings are set next to the main house, rebar goes in, the foundation walls are poured, and a gravel base with plumbing stubs, rigid foam and the slab pour follow. The walls are framed on the slab and raised against the house, then roof sheathing, house wrap, lap siding and new windows, electrical and plumbing rough-in, and drywall around the skylights. The final scenes show the finished kitchen, living room and bathroom, and the front with its two entries. Each stage is labeled on screen with its name and a short caption, and the film ends on the MNBE card: Design, Permits, Construction, mnbe-wa.com, (206) 637-0044.
What the homeowner says
We hired Aharon from MNBE Construction & Development to build our ADU in Bellevue, and the entire experience was amazing. … Aharon also took care of all communication with the City of Bellevue, coordinated every required inspection, and made sure the project passed each one without any issues. The process was smooth, professional, and stress-free. The quality of workmanship is outstanding, and the ADU turned out better than we imagined.
Explore MNBE's completed construction work, or tell us about the ADU, addition or new home you are planning in the Seattle area.
Length 1:31Seattle & the Eastside · All stages
Length 0:56White Center, WA · ADU
Length 0:56Seattle (Magnolia) · DADU
Length 0:48Redmond, WA · DADUTell us about your lot. We'll walk it, confirm what's buildable, and come back with a written, fixed price bid.
Thank you for considering MNBE for your project. We respond within one business day, Monday through Saturday.